Dedicated test centre

Hydro Building Systems has opened a new dedicated test centre for its Wicona brand of facade products – one of the first energy neutral industrial buildings in Europe.

Located at Bellenberg near the Wicona Brand Development Centre at Ulm in Germany, €3.5m scheme will allow new products and project-specific facade solutions to be tested in-house and independently certified to the latest European standards.

The testing procedures and equipment have been developed by Wicona in conjunction with IFT Rosenheim (Institute of Window Technology), an independent accreditor. Facilities in the new centre include two facade test rigs, a testing rig for windows and accessories, and a ‘hot box’ to assess thermal performance.

The facade test rig allows samples up to 10m x 10m to be rigorously tested under a full range of stringent weather performance and safety conditions – air permeability, static and dynamic water pressure, wind and impact resistance.

The window test rig is designed for combinations of windows, doors and fixed light glazing with frame sizes of up to 3.6m x 2.9m, assessing air permeability, water tightness, and wind and impact resistance. There is also a fitting rig to carry out performance tests on doors and windows up to 4m high, and their fittings and accessories.

The new Wicona test centre is designed to be highly energy efficient and sustainable, consuming only 23kWh/m2a of energy for heat and light – around the same as a standard passive house. Roof-mounted photovoltaic panels harness energy from the sun and generate sufficient power for heating and lighting the entire building. The surplus 30,000kWh/a produced also provides the operating energy for the test centre, making it one of the first zero emission production buildings.

A Wicona facade solution is integrated with the building services and low energy technology, and is highly glazed to allow most of the testing to be carried out without the need for artificial lighting. The large volumes of water required for the facade tests use a closed water circuit to minimise consumption.

Commenting on the new facility, Bob Welsh, general manager of Wicona in the UK, said: “This is a fantastic new resource for the Wicona brand. To have a facility of this quality that is dedicated to Wicona products and fitted out with state-of-the-art testing systems, reinforces our position as a market leader in facade technology.

“The new centre will allow us to continue to develop innovative solutions as well as designs for more bespoke, project-specific applications, and will give us the opportunity to pre-test and pre-certify new systems more efficiently and at an earlier stage.”

www.wiconaprojects.co.uk
0845 602 8799




RETURN TO HOME PAGE